## How the interviewer opens it

"Design an infrastructure as code platform. Users describe the cloud resources they want, then ask the service to preview and apply changes."

## What to clarify first

- Workspaces and ownership
- Traffic and read:write mix
- Cloud work and duration
- Approval and destructive changes
- Latency
- Consistency and availability
- Provider and worker failures
- Durability and retention
- External changes and secrets
- Provider support and exclusions

## Scope of a strong answer

Core requirements:

- Preview resource creates, updates, replacements, and deletes.
- Apply an approved plan in the correct resource order.
- Coordinate changes to each workspace and preserve its state.
- Recover after worker failure or a partially completed apply.

Usually out of scope:

- A new configuration language
- Custom provider code
- Transactions across workspaces
- Continuous drift repair
- Active-active regions

## What interviewers probe

### Plan contents and approval

Cloud resources can change after a preview. A valid state serial does not prove that the cloud still matches the approved plan.

### Concurrent changes

A delayed worker can still send cloud requests after its lease expires. State ownership alone cannot stop those requests.

### Incomplete changes

A cloud API can create a resource before the worker records success. The service cannot undo all resources as one transaction.

### Resource execution

Resources depend on other resources. A replacement can require a different action order from a create or delete.

## Common mistakes

- The design treats a valid state serial as proof of the current cloud state.
- The design changes approved actions after drift without new approval.
- The design assumes lease expiry stops an old worker's cloud requests.
- The design starts replacement execution before earlier provider effects reach known outcomes.
- The design retries a create after a timeout without checking its outcome.
- The design saves progress only after the entire apply succeeds.

## The bar by level

- **Senior:** Binds approval to an immutable plan and checks cloud facts before execution. Handles duplicate jobs, uncertain provider results, and durable resource progress. Distinguishes state ownership from control over cloud mutations.
- **Staff+:** Defines a takeover protocol that stops old mutations and reconciles pending effects before replacement execution. Explains external drift guarantees when providers lack conditional writes. Defines tenant isolation, quota fairness, and audited recovery.